Tech' subs'

“We write technical submissions that get the detail right before the work gets underway.”

Provides an essential link between the project specification.

Prepared during the pre-contract and tender stages, to identify the equipment, materials and systems upon which the contractor's offer is based and demonstrate compliance with the specified technical, performance and statutory requirements.

 

This information subsequently provides an important foundation for construction-stage approvals and the preparation of final O&M documentation.

 

It is reviewed and updated to reflect the equipment and systems actually installed before inclusion within the final handover documentation.

 

01c410e5-be73-4410-ba99-68b939424cc5.png

'“Technical Submissions are the first phase of the O&M Manual authoring process  establishing the technical information, products and systems that will ultimately form the record of the completed building.”

Eric J Cooper

Son of The Black Country

Office 01922 868286

01922 868286

©  2026 Written, designed and occasionally bent out of shape by The Manualwriter.

If there's a doubt, there is no doubt

bottom of page